📞 (909) 565-9487   ✉️ general@ezcontra.com   📍 Inland Empire

⭐⭐⭐⭐⭐ 4.9 Google  |  Customer Portal →

ADU Construction · Rialto, CA

ADU Construction in Rialto, CA

Detached ADUs, garage conversions, and junior ADUs in Rialto. Plans drawn, permits pulled, built to code by a licensed crew.

Book Free Estimate
  • CSLB #1083451
  • Insured
  • 5.0 ★ Google
  • Family-owned since 2011

Why Rialto homeowners pick E-Z Contracting

Real licensing, real warranties, real crews — not a middleman with a clipboard.

Local & Licensed

CSLB #1083451, family-owned since 2011. We answer the phone and stand behind our work in writing.

Free Written Quote

Detailed line-item quote within 48 hours. The price you sign is the price you pay — no surprise change orders.

One Crew, No Subs Chain

Our own carpenters, tile setters, electricians, and painters — not a middleman hiring day-laborers.

Permits Done Right

We pull permits with the city, schedule inspections, and hand you signed-off paperwork. Resale stays clean.

How adu construction works in Rialto

Four steps from first call to final walk-through. In writing.

1

Free Estimate

Book online or call (909) 565-9487. We come to your Rialto home, measure, and listen — no charge, no pressure.

2

Written Quote

Detailed line-item quote in writing within 48 hours. Materials, labor, timeline — all spelled out.

3

Permits & Build

We pull Rialto permits, order materials, and build with our own licensed crew. Foundation, framing, MEP, finish — all in-house licensed crew.

4

Walk-Through & Warranty

Final walk-through, punch list closed, written warranty in your hand.

ADU Construction FAQs · Rialto

Most Rialto ADUs run $90K–$220K depending on square footage, finish level, and whether it is detached vs. attached. Written line-item quote.

How long does a Rialto ADU build take?

Detached ADU from permit to final inspection: 5–8 months typical. Garage conversion: 3–5 months. Permitting timeline depends on the city.

What size ADU can I build in Rialto?

California state law allows up to 1,200 sq ft for a detached ADU on most lots, plus a junior ADU up to 500 sq ft. Rialto may have additional setback or height rules — we check the city code before quoting.

Do I need plans drawn?

Yes — we draw architectural plans, structural plans, Title 24 energy compliance, and submit the full package to the city for permit. All included in our scope.

Can you finance an ADU?

We do not provide financing directly, but we can refer you to local credit unions and HELOC lenders that specialize in ADU construction loans.

Do you handle utility hookups?

Yes — water, sewer, gas, and electrical sub-panel from main house or new service. Included in the scope.

ADU Construction across the Inland Empire

We also serve: Fontana · Rancho Cucamonga · Ontario · San Bernardino · Colton · Chino · Upland

Ready to start your Rialto ADU build?

Free written estimate within 48 hours. Most projects start within 2–4 weeks of signing.

Book Free Estimate