Turn Your Backyard Into an ADU — Permits Handled, Built Right

Full-service ADU construction for Fontana, Rancho Cucamonga, Ontario, Rialto, and across the Inland Empire. Detached, attached, garage conversions, and JADUs — we handle design, permits, and construction.

CSLB License #1140501 · Bonded & Insured · ★★★★★ 5.0 on Google
Licensed & Bonded 100% Satisfaction Free Estimate Inland Empire Same-Week Start

Every Part, Handled Under One Roof

Full-service ADU construction for Fontana, Rancho Cucamonga, Ontario, Rialto, and across the Inland Empire. Detached, attached, garage conversions, and JADUs — we handle design, permits, and construction.

Detached ADUs

400–1,200 sq ft standalone units with their own address, utilities, and entrance.

Attached ADUs

Additions that share a wall with the main house — efficient and often faster to permit.

Garage Conversions

Convert an existing garage into a permitted legal ADU with full kitchen and bath.

JADUs (Junior ADUs)

Up to 500 sq ft within the existing home — the fastest and cheapest path to rental income.

Design & Permits

Full architectural plans, engineering, Title 24, and City of Fontana or county permit submissions.

Utilities & Site Work

New electrical panels, sewer taps, gas runs, concrete work, and landscaping cleanup.

ADUs We Design & Build

Detached studios, backyard cottages, and garage conversions — built to hold up as rentals for decades.

How It Works

A clear, no-surprises path from first call to finished job.

1

Free Feasibility Meeting

We walk your property, check setbacks and utilities, and tell you honestly what’s possible and what it costs.

2

Design & Fixed Quote

Preliminary plans, a written fixed-price quote, and a realistic timeline — typically within 2–3 weeks.

3

Permits & Plan Check

We submit to the City of Fontana or applicable jurisdiction and handle all corrections and revisions.

4

Construction & Final Sign-Off

Foundation to finish in 4–7 months typically, ending with final inspection and a written warranty.

Frequently Asked Questions

How much does an ADU cost in the Inland Empire?

Garage conversions typically run $110K–$170K. Attached ADUs $180K–$260K. Detached new-build ADUs $220K–$380K+ depending on size and finishes. Your fixed-price quote is always itemized.

How long does an ADU project take?

Design + permits: typically 3–5 months. Construction: 4–7 months. Total project: 7–12 months from signed contract to final inspection. Garage conversions can be faster.

Do I need permits?

Yes — every ADU requires permits in California. We handle all of it: Title 24, structural engineering, plan check, school fees, and inspections.

Can I rent the ADU out?

Yes. Under current California law, ADUs can be rented long-term. Short-term rental rules vary by city — we’ll tell you what’s allowed in Fontana or your jurisdiction.

Will the ADU add to my property taxes?

Yes — only the new ADU value is reassessed, not your entire property. We can connect you with a tax pro to run the numbers.

Do you offer financing?

Yes. We work with ADU-specific lenders, HELOCs, and cash-out refis. Ask at your free estimate.

Service Areas We Cover

Serving Fontana and surrounding Inland Empire cities. Tap your city for details on our work in your area.

See What Your ADU Could Look Like

Book your free feasibility meeting. We’ll walk the property, check setbacks and utility routes, and send a fixed-price proposal within 2 weeks.

CSLB #1140501 · ★★★★★ 5.0 on Google · Serving Fontana, Rancho Cucamonga, Ontario, Rialto & the Inland Empire